Yangjiang subsidence observation point observation target Cangzhou Shuntian received orders nationwide
Yangjiang subsidence observation point observation target Cangzhou Shuntian received orders nationwide

Yangjiang subsidence observation point observation target Cangzhou Shuntian received orders nationwide

Category:

metallurgy/Stainless steel material/Stainless steel bars

Model:

Brand:

Cangzhou Shuntian

grade:

Observation standard

cross-sectional shape:

round bar

surface treatment:

glossy surface

Processing Technology:

Forging

tensile strength:

370MPa~480MPa

Processing Service:

deep processing

execution standard:

National Standard

quality grade:

A-level

Processing & Customization:

yes

Is it imported:

No

weight:

one

Scope of application:

rail transit

delivery service:

Can be delivered to the factory

Type of goods sales:

spot

Item Number:

twenty thousand one hundred and twenty

warehouse address:

Cangzhou, Hebei

warehouse phone:

fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven

manufacturer:

Cangzhou Shuntian Steel Pipe Co., Ltd

Retail Price

5.00USD


重量

kg

  • Product Description
  • grade

    Observation standard

    cross-sectional shape

    round bar

    surface treatment

    glossy surface

    Processing Technology

    Forging

    tensile strength

    370MPa~480MPa

    Processing Service

    deep processing

    execution standard

    National Standard

    quality grade

    A-level

    Processing & Customization

    yes

    Is it imported

    No

    weight

    one

    Scope of application

    rail transit

    delivery service

    Can be delivered to the factory

    Type of goods sales

    spot

    Item Number

    twenty thousand one hundred and twenty

    warehouse address

    Cangzhou, Hebei

    warehouse phone

    fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven

    manufacturer

    Cangzhou Shuntian Steel Pipe Co., Ltd

    Description :

      Yangjiang subsidence observation point observation target Cangzhou Shuntian received orders nationwide

      Easy to use, it has become an essential instrument for vertical deformation observation in the construction of weak road embankments. However, the phenomenon of damage due to improper protection during construction is common. This article introduces the burial and observation techniques of settlement plates, and summarizes the application techniques of settlement observation data in highway engineering. 1. Burial and observation of settlement plates 1.1 The vertical displacement observation of the instrument standard surface generally uses settlement plates. The settlement plate is composed of a steel bottom plate or reinforced concrete plate, a metal measuring rod, and a protective sleeve. The size of the base plate is generally 50cm × 50cm × 2cm, and the diameter of the measuring rod is recommended to be 4cm. The protective sleeve can be made of hard and strong PVC pipe, and the size should be able to cover the measuring rod with appropriate gaps. Figure 1 shows a photo of the settlement plate on site. Figure 1 Settlement Plate 1.2 Burial Technology Settlement plates should be buried on the left and right shoulders of the embankment and on the original ground below the center. The "Design and Construction Technology of Highway Soft Soil Embankment" (JTJ) has the following regulations for the extension of settlement plates. As the filling height increases, the measuring rod and casing should also be correspondingly raised, and the length of each section should not exceed 50cm. The top surface of the raised measuring rod should be slightly higher than the upper opening of the casing, and the upper opening of the casing should be covered and sealed to prevent the filling material from falling into the pipe and affecting the free sinking of the measuring rod

      Why is the road outside our house constantly being repaired? The road of rifling and breaking the belly has caused unbearable suffering for the common people. Data shows that from 2020 to present, there have been nearly 5000 road excavation projects in Shanghai, and the citizen hotline 12345 has received nearly 3000 complaints. But a citizen's suggestion has led to a systematic governance plan for repeated road excavation, and this issue will change in the future.

      On the evening of January 17th, the "Building a Better City and Creating a Better Life Together" Shanghai People's Proposal Collection Activity was held at Magnolia Square. Citizen Feng Xiaowen's "Relying on the 'Two Networks' to Source Control the Repeated Excavation of Road Problems" is recommended to be listed in the "2021 Shanghai Excellent People's Suggestions 100 Cases".

      A suggestion to promote the birth of a specialized governance plan

      I am a law enforcement officer in urban management, and I have found that road excavation is a very common phenomenon in my work. Some roads will be excavated repeatedly in a short period of time, "said Feng Xiaowen, a staff member of the Jinshan District Urban Management Law Enforcement Bureau, in an interview. During the research, some people said that it would be great if we could install a zipper on the road to avoid easily opening our stomachs. Road excavation can affect traffic flow and may also cause unnecessary accidents. In addition, noise problems caused by road excavation near residential areas and office buildings also affect people's daily routines

      Feng Xiaowen wrote a suggestion based on her work experience, hoping to strengthen unified planning and avoid the problem of repeated road excavation from the source. Relevant departments need to make reasonable predictions on new demand, develop annual plans for various road construction projects, and publicize them to the society, playing a role in mutual supervision and also giving citizens a general understanding. Feng Xiaowen also suggested strengthening overall coordination and reducing the impact of road excavation on the public.

      Feng Xiaowen did not expect that her suggestion was taken seriously and directly promoted the treatment of the stubborn problem of repeated road excavation.

    AfterSalesService :

    Key words:
    • Yangjiang subsidence observation point