Identification of lightning protection, lightning protection and grounding test points on the measurement signs of observation points in Mianyang
Identification of lightning protection, lightning protection and grounding test points on the measurement signs of observation points in Mianyang

Identification of lightning protection, lightning protection and grounding test points on the measurement signs of observation points in Mianyang

Category:

metallurgy/Stainless steel material/Stainless steel bars

Model:

Brand:

Cangzhou Shuntian

grade:

Observation standard

cross-sectional shape:

round bar

surface treatment:

glossy surface

Processing Technology:

Forging

tensile strength:

370MPa~480MPa

Processing Service:

deep processing

execution standard:

National Standard

quality grade:

A-level

Processing & Customization:

yes

Is it imported:

No

weight:

one

Scope of application:

rail transit

delivery service:

Can be delivered to the factory

Type of goods sales:

spot

Item Number:

twenty thousand one hundred and twenty

warehouse address:

Cangzhou, Hebei

warehouse phone:

fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven

manufacturer:

Cangzhou Shuntian Steel Pipe Co., Ltd

Retail Price

7.00USD


重量

kg

  • Product Description
  • grade

    Observation standard

    cross-sectional shape

    round bar

    surface treatment

    glossy surface

    Processing Technology

    Forging

    tensile strength

    370MPa~480MPa

    Processing Service

    deep processing

    execution standard

    National Standard

    quality grade

    A-level

    Processing & Customization

    yes

    Is it imported

    No

    weight

    one

    Scope of application

    rail transit

    delivery service

    Can be delivered to the factory

    Type of goods sales

    spot

    Item Number

    twenty thousand one hundred and twenty

    warehouse address

    Cangzhou, Hebei

    warehouse phone

    fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven

    manufacturer

    Cangzhou Shuntian Steel Pipe Co., Ltd

    Description :

      According to the Reply of the Management Committee of China (Mianyang) Science and Technology City on Adjusting the Approval of the Third Phase Project of China Science and Technology City Mianyang Convention and Exhibition Center (Science and Technology City Management Committee Letter [2016] No. 73), Mianyang Science and Technology City Development Investment (Group) Co., Ltd. is responsible for implementing the third phase of the Science and Technology City Convention and Exhibition Center project. In order to ensure the smooth implementation of the project, the competitive negotiation of settlement observation for the project is hereby announced as follows.

      1、 Project Name: Settlement Observation of Phase III, Section 2 of the Convention and Exhibition Center.

      2、 Project location: Mianyang Convention and Exhibition Center Phase III

      3、 Settlement observation content:

      1. Monitoring objective: Based on the layout plan of the foundation pit monitoring for the second section of the third phase of the exhibition provided by the geological exploration unit, conduct settlement observation of the foundation pit and buildings.

      2. Monitoring content: mainly monitoring the horizontal and vertical displacement of the slope top around the foundation pit, and monitoring the deformation speed of the foundation pit; Set up relevant settlement monitoring points after the construction of the foundation cushion layer to monitor the settlement displacement of the foundation pit and the settlement data of the building after future load loading. Mainly set up slope top horizontal displacement and settlement observation points around the foundation pit; Ground settlement monitoring points are set up in the tennis court and swimming pool areas on the west side of the foundation pit (mainly for observing the settlement of buildings).

      3. According to the requirements of the national "Code for Deformation Measurement of Buildings" JGJ8-2007, conduct settlement observation and prepare a settlement observation report.

      4. Monitoring cycle: Generally, the monitoring is carried out according to the table below. If there are any abnormal deformations in the observation data of the top displacement and settlement of the foundation pit during the construction process. ② The settlement observation related values exceed the warning value. ③ Cracks and collapses have occurred on the roads and slopes around the foundation pit. ④ Abnormal situations occur in the building itself and surrounding buildings. ⑤ Abnormal situations caused by natural disasters, etc. The settlement observation plan should be adjusted in a timely manner and the monitoring frequency should be increased. Simultaneously report to the on-site supervisor for filing.

    construction conditions

      

    monitoring frequency

      

    During excavation of foundation pit (excavation depth H) H≤5m Once every 3 days
    5<H≤11m 1 time/2 days
    After the excavation of the foundation pit is completed 1-7 days once a day

      7-15 days

      

    1 time/2 days

      

    15-30 days

      

    Once every 3 days

      

    After 30 days

      

    once a week

      

    After confirming the stability of the foundation pit through data analysis

      

    once a month

      

      6、 Observation requirements: The observation unit shall prepare a detailed settlement observation plan in accordance with the relevant specifications for engineering surveying in Sichuan Province and the requirements of the national "Code for Deformation Measurement of Buildings" JGJ8-2007. Based on the survey data provided by the geological exploration unit, set up observation points according to the settlement observation plan, record and statistically analyze settlement observation data. The observation data results comply with relevant regulations, and the observation unit is responsible for the settlement observation related data.

      7、 Monitoring deadline: Meet the monitoring deadline requirements of the construction unit.

      8、 Materials to be submitted during registration

      (1) Copy of the unit introduction letter and the ID card of the handling person;

      (2) Copy of business license duplicate;

      (3) Copy of qualification certificate.

      (4) One or more achievements in settlement observation of construction projects. (Copy of contract).

      The above information needs to be stamped with the fresh seal of the unit.

    AfterSalesService :

    Key words:
    • Mianyang Observation Standard