Layout of settlement observation points for Ya'an L-type straight observation standard
Category:
metallurgy/Stainless steel material/Stainless steel bars
Model:
Brand:
Cangzhou Shuntian
grade:
Observation standard
cross-sectional shape:
round bar
surface treatment:
glossy surface
Processing Technology:
Forging
tensile strength:
370MPa~480MPa
Processing Service:
deep processing
execution standard:
National Standard
quality grade:
A-level
Processing & Customization:
yes
Is it imported:
No
weight:
one
Scope of application:
rail transit
delivery service:
Can be delivered to the factory
Type of goods sales:
spot
Item Number:
twenty thousand one hundred and twenty
warehouse address:
Cangzhou, Hebei
warehouse phone:
fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven
manufacturer:
Cangzhou Shuntian Steel Pipe Co., Ltd
Retail Price
7.00USD
重量
kg
- Product Description
-
grade Observation standard
cross-sectional shape round bar
surface treatment glossy surface
Processing Technology Forging
tensile strength 370MPa~480MPa
Processing Service deep processing
execution standard National Standard
quality grade A-level
Processing & Customization yes
Is it imported No
weight one
Scope of application rail transit
delivery service Can be delivered to the factory
Type of goods sales spot
Item Number twenty thousand one hundred and twenty
warehouse address Cangzhou, Hebei
warehouse phone fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven
manufacturer Cangzhou Shuntian Steel Pipe Co., Ltd
Description :
Layout of settlement observation points for Ya'an L-type straight observation standard
In the observation process of buildings, it is necessary to set benchmark points, because the main method of settlement observation is to use leveling measurement to measure the height difference between benchmark points and observation points multiple times to determine the degree of settlement of the building. Therefore, the setting of settlement points is very important, and special attention should be paid to the following requirements when setting settlement points:
(1) At least three benchmark points should be established in each observation area to compare positive effects. Ensure the accuracy of the obtained results.
(2) The benchmark set should not be affected by settlement, and attention should also be paid to avoiding areas where the marker stones are easily damaged. The burial depth should not be higher than 0.5m above the freezing line.
(3) To control the distance between the observation point and the benchmark, it should not be less than 20m or more than 100m. The pre embedded part signs for settlement observation points can be in the form of wall observation points, observation points on reinforced concrete columns, and observation points on foundations.






Layout of settlement observation points
The observation of settlement must comprehensively reflect the settlement characteristics of the foundation, so when setting settlement points, suitable observation point locations must be selected based on geological conditions and building structural characteristics. You can refer to the following locations for details:
(1) When setting up on the four corners of the building, every 10-15 meters on the exterior walls, and on the column foundation, attention should be paid to spacing 2-3.
(2) The junction between high-rise and low rise buildings, the junction between new and old buildings, and the junction between vertical and horizontal walls should be set on both sides of the junction.
(3) On both sides of the boundary between different structural structures, such as building cracks, settlement joints, and the boundary between artificially created foundations and natural foundations.
Selection of settlement observation markers
In the actual construction process, different signs such as wall or column signs, concealed signs, and foundation signs should be adopted according to different building materials and structures. Although the signs are different, the upright part of the sign should have a prominent protrusion or a semi-circular shape, and attention should be paid to anti-corrosion treatment. When pre embedding, it is important to maintain a certain distance between the ruler and the wall or floor, while also avoiding obstacles that obstruct observation, such as window sills.


AfterSalesService :
Key words:- Ya'an L-type straight observation standard
More Products