Installation method of Meishan observation mark settlement observation point
Category:
metallurgy/Stainless steel material/Stainless steel bars
Model:
Brand:
Cangzhou Shuntian
grade:
Observation standard
cross-sectional shape:
round bar
surface treatment:
glossy surface
Processing Technology:
Forging
tensile strength:
370MPa~480MPa
Processing Service:
deep processing
execution standard:
National Standard
quality grade:
A-level
Processing & Customization:
yes
Is it imported:
No
weight:
one
Scope of application:
rail transit
delivery service:
Can be delivered to the factory
Type of goods sales:
spot
Item Number:
twenty thousand one hundred and twenty
warehouse address:
Cangzhou, Hebei
warehouse phone:
fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven
manufacturer:
Cangzhou Shuntian Steel Pipe Co., Ltd
Retail Price
8.00USD
重量
kg
- Product Description
-
grade Observation standard
cross-sectional shape round bar
surface treatment glossy surface
Processing Technology Forging
tensile strength 370MPa~480MPa
Processing Service deep processing
execution standard National Standard
quality grade A-level
Processing & Customization yes
Is it imported No
weight one
Scope of application rail transit
delivery service Can be delivered to the factory
Type of goods sales spot
Item Number twenty thousand one hundred and twenty
warehouse address Cangzhou, Hebei
warehouse phone fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven
manufacturer Cangzhou Shuntian Steel Pipe Co., Ltd
Description :
Those familiar with settlement observation can skip it directly. This article is aimed at friends who are just starting to conduct settlement observation and are not very familiar with the process.
According to regulations, the number of elevation reference points for special grade settlement observations should not be less than 4, and the number of elevation reference points for other grade settlement observations should not be less than 3. The elevation work base point can be set as needed, and the base point and work base point should form a closed loop or a node network composed of attached routes.
Since the requirements are all stipulated in this way, there must be some reason for it. First, let's familiarize ourselves with the layout and burial diagram of the reference points.
According to the site conditions, three settlement observation reference points are set up to form a ring shape, as shown in Figure 1. The reference points are located at the outer wall corner of the site, with stable foundation, good visibility, no external interference, and easy use. They are located 60 meters away from the building. G1 was built at the beginning of the project construction and has an elevation of 5 meters. The reference point for deformation measurement is set outside the deformation area, in a stable location that is easy to store for a long time, and is regularly retested. The retest period should be determined based on the stability of the reference point location. During the construction process, retesting should be conducted once every 1-2 months, and after the point location is stable, retesting should be conducted every six months.






Schematic diagram of benchmark point layout
The elevation benchmark stone is buried in the undisturbed soil layer and is a concrete ordinary leveling stone. The specifications and burial requirements for benchmark stones are shown in the figure
Ordinary concrete level marker stone
So, why do we choose three or more? Remember, the article mentions a very important reason for the rise of settlement observation points, which is the sinking of the reference point or working base point. In order to verify the sinking of a certain reference point, we need to conduct closed leveling measurements on three reference points. If we set two reference points in the early stage, we cannot verify the sinking of one reference point. However, if we set three reference points and one of them sinks, after the second measurement is completed, we can distinguish which point has a different height difference from the other two points. This way, we can easily determine that the third point has a problem and then rearrange the reference points.
So no matter what, it is necessary for us to set up three or more benchmark points in the early stage. In the actual measurement process, it is common for settlement observation points to rise in large quantities. In this case, we can rule out whether it is a problem with setting up benchmark points based on this.
AfterSalesService :
Key words:- Meishan observation marker
More Products