Lanzhou observation pole observation pile L-shaped observation pole direct buried observation pile with excellent sales price
Lanzhou observation pole observation pile L-shaped observation pole direct buried observation pile with excellent sales price

Lanzhou observation pole observation pile L-shaped observation pole direct buried observation pile with excellent sales price

Category:

metallurgy/Stainless steel material/Stainless steel bars

Model:

Brand:

Cangzhou Shuntian

grade:

Observation standard

cross-sectional shape:

round bar

surface treatment:

glossy surface

Processing Technology:

Forging

tensile strength:

370MPa~480MPa

Processing Service:

deep processing

execution standard:

National Standard

quality grade:

A-level

Processing & Customization:

yes

Is it imported:

No

weight:

one

Scope of application:

rail transit

delivery service:

Can be delivered to the factory

Type of goods sales:

spot

Item Number:

twenty thousand one hundred and twenty

warehouse address:

Cangzhou, Hebei

warehouse phone:

fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven

manufacturer:

Cangzhou Shuntian Steel Pipe Co., Ltd

Retail Price

12.00USD


重量

kg

  • Product Description
  • grade

    Observation standard

    cross-sectional shape

    round bar

    surface treatment

    glossy surface

    Processing Technology

    Forging

    tensile strength

    370MPa~480MPa

    Processing Service

    deep processing

    execution standard

    National Standard

    quality grade

    A-level

    Processing & Customization

    yes

    Is it imported

    No

    weight

    one

    Scope of application

    rail transit

    delivery service

    Can be delivered to the factory

    Type of goods sales

    spot

    Item Number

    twenty thousand one hundred and twenty

    warehouse address

    Cangzhou, Hebei

    warehouse phone

    fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven

    manufacturer

    Cangzhou Shuntian Steel Pipe Co., Ltd

    Description :

      The burial of settlement observation targets is a guarantee for the smooth progress of engineering construction, so its burial should be careful. The burial of observation targets also varies depending on the environment. Different environments have different burial methods. Below, the editor will carefully introduce them to you:

      1. For framed buildings, settlement observation markers are generally buried in the upper part of the pile foundation.

      2. For some newly constructed buildings, observation markers need to be buried at the junction of the new and old buildings.

      3. Buildings with load-bearing brick walls should have observation markers set up at regular intervals.

      4. Buildings containing liquids need to be buried in corresponding locations.

      Specific testing procedures and steps

      1. Establish a level control network

      Based on the characteristics of the project layout and the environmental conditions on site, a measurement and construction plan shall be formulated. The leveling control points (or urban precision traverse points) provided by the construction unit shall establish a leveling control network according to the requirements of the project's measurement and construction plan and network layout principles. Requirement: (1) Generally, there should be at least 3 leveling points arranged around high-rise buildings, with a spacing of no more than 100 meters; (2) At least 2 leveling points should be visible from the rearview of any instrument installed in the field area, and each leveling point in the field area should form a closed shape for closed calibration; (3) Each leveling point should be set outside the excavation, ground settlement, and vibration zone of the building. The burial depth of the leveling point should meet the requirements of second-class leveling measurement (greater than 1.5 meters). Based on the characteristics of the project, a reasonable leveling control network should be established, and the elevation of each leveling point should be calculated by joint measurement with the benchmark point and adjustment.

      2. Establish a fixed observation route

      Determine the location of settlement observation points based on the burial requirements of settlement observation points or the settlement observation point layout diagram designed by the site level control network. Establish a fixed observation route between the control point and the settlement observation point, and mark the instrument stations and turning points with markers to ensure that all observations follow a unified route.

      If the situation of prevention and control remains severe after the Spring Festival, and steel companies in the region cannot quickly resume production, the expectation of market supply contraction will be further strengthened. It is not ruled out that market capital may engage in misplaced speculation before the reality of the industry, thereby driving resonance and upward momentum. The steel market may have a "good start" after the Spring Festival. However, in the pattern of "weak supply and demand", there is great uncertainty about whether the market can continue to rise, and it cannot be ruled out that steel prices may fall due to the obstruction of high-level transactions. If the region can be quickly and effectively controlled, the release of supply side resources will gradually return to normal after the Spring Festival. At the same time, the construction progress of downstream projects will also accelerate, and the market will enter a fundamental game of supply and demand. Considering that the market is in the traditional off-season of demand in February, the supply side is likely to dominate the market trend, and it cannot be ruled out that steel prices may experience a temporary increase driven by strong demand expectations.

    AfterSalesService :

    Key words:
    • Lanzhou Observation Standard