Xizang settlement plate production Cangzhou Shun overpass beam 500 specification settlement plate
Xizang settlement plate production Cangzhou Shun overpass beam 500 specification settlement plate

Xizang settlement plate production Cangzhou Shun overpass beam 500 specification settlement plate

Category:

metallurgy/Steel plate/steel plate

Model:

complete

Brand:

Shun Tian

brand:

Shun Tian

model:

complete

material:

p235

Specifications:

400-500

purpose:

settlement observation

Processing & Customization:

yes

Is it imported:

No

Product Features:

Easy construction

Place of Origin:

Hebei

Retail Price

60.00USD


重量

kg

  • Product Description
  • brand

    Shun Tian

    model

    complete

    material

    p235

    Specifications

    400-500

    purpose

    settlement observation

    Processing & Customization

    yes

    Is it imported

    No

    Product Features

    Easy construction

    Place of Origin

    Hebei

    Description :

      Xizang settlement plate production Cangzhou Shun overpass beam 500 specification settlement plate

      A high-rise residential project developed by a developer in Wuzhou, Guangxi, began to experience serious tilting, breakage, sinking, water leakage and other phenomena after delivery in 2018. The building tilted about 14 centimeters northwest, with a cumulative settlement of about 70 millimeters, posing a serious threat to the personal and property safety of residents and causing great negative impact on the developer's corporate brand. Therefore, the developer hopes to choose a low disturbance, high stability, long-lasting and reliable straightening and tilting scheme that can quickly stabilize the foundation and lift the straightening and tilting building without affecting residents.

      The production and use of settlement plates: 1. The settlement plate is composed of steel plates, measuring rods, and protective sleeves. The size of the base plate is 120cm × 50cm × 3cm, and the measuring rod is made of Φ 40mm steel pipe, fixed in a vertical position with the base plate. The protective sleeve is made of plastic sleeve, and the sleeve size is suitable to cover the measuring rod and allow the ruler to enter the measuring head. As the filling height increases, the measuring rod and sleeve are also correspondingly raised, with each section not exceeding 55cm in length. After raising, the top surface of the measuring rod should be slightly higher than the upper opening of the sleeve. When not measuring, seal the upper opening of the casing with a cap to prevent the filler from falling into the pipe and affecting the sinking of the measuring rod. Before installation, the roadbed surface must be compacted, and the installation position must be measured. Once the position is fixed, the bottom elevation of the slab should be measured immediately, and this value should be recorded as the initial value. After filling the height beyond 20cm of the observation rod mouth, compact the entire section, and then extend the measuring rod and protective sleeve of the settlement plate. The extension method can be threaded connection or welding connection (measuring rod welding, protective sleeve connection with adhesive tape). After connection, immediately measure the elevation and calculate the actual connection length. (1) Dig a soil pit of about 500 × 500 × 500mm at the burial site, and level and compact the pit with 30-50mm thick yellow sand. (2) Place the settlement plate flat in the pit, fill the surrounding area with yellow sand and calibrate the level with a level, and then backfill the soil to level and compact it. (3) When filling, the filling should be compacted around the settlement plate first to protect the settlement. The protective sleeve should be buried 30cm away from the bottom plate. (4) After the previous layer of filling material is compacted, excavate the filling material to the protective sleeve at the pre embedded position, open the pipe plug to measure the elevation of the pipe head, and the difference between the two elevations is the settlement between observations. Then connect the previous section of connecting pipe and protective sleeve, measure the elevation of the pipe head, install the pipe plug, backfill and compact, and so on. The height of the pipe head with a good pipe plug should be 3-5c lower than the formed filling surface

    AfterSalesService :

    Key words:
    • Xizang settlement plate