Guangxi Dongxing Observation Plate Settlement Plate National Shipping Specifications Full
Category:
metallurgy/Steel plate/steel plate
Model:
complete
Brand:
Shun Tian
brand:
Shun Tian
model:
complete
material:
p235
Specifications:
400-500
purpose:
settlement observation
Processing & Customization:
yes
Is it imported:
No
Product Features:
Easy construction
Place of Origin:
Hebei
Retail Price
60.00USD
重量
kg
- Product Description
-
brand Shun Tian
model complete
material p235
Specifications 400-500
purpose settlement observation
Processing & Customization yes
Is it imported No
Product Features Easy construction
Place of Origin Hebei
Description :
The settlement observation construction of building engineering is mainly aimed at the effective investigation and construction of preventing the consequences of building settlement and deformation. It can prevent or avoid the consequences of structural damage and overall cracking of building engineering caused by settlement deformation through orderly construction and reasonable construction procedures. So, in order to carry out settlement construction more effectively, it is necessary to comprehensively grasp the basic requirements of settlement observation. The so-called hardware requirements refer to the ability to have excellent instruments and equipment during the observation process, which means the need for high-quality settlement observation talents. This is mainly due to the high precision requirements of settlement observation itself, which requires the ability to reflect the settlement situation of buildings during the continuous loading process. So, in order to meet the requirements of settlement observation






Observation and timing should depend on the foundation and loading conditions. Civil buildings can be observed once every 1-2 floors of height increase; Industrial buildings can be observed separately according to different construction stages, such as backfilling foundation pits, installing columns and roof trusses, masonry walls, and equipment installation. If the building is uniform, it should be measured at least once for every 25% increase in load. If the construction process is temporarily suspended, observation should be conducted once during the suspension and once again during the resumption of work. During the shutdown period, observations can be made every 2-3 months. Observe once every 1-2 months after topping out, and the observation period after completion will be determined based on the condition of the building. Observation should depend on the type of foundation soil and the magnitude of settlement rate. Generally, observations are made 3-4 times a year, 2-3 times in the second year, and once a year after the third year, until then. The observation period is generally stipulated as follows: 2 years for sandy soil foundation, 3 years for soil foundation, 5 years for clay foundation, and 10 years for soft soil foundation. Guangxi Dongxing Observation Plate Settlement Plate National Shipping Specifications Full
AfterSalesService :
Key words:- Guangxi Dongxing Observation Board
More Products