Guangxi Dongxing Observation Plate Settlement Plate National Shipping Specifications Full
Guangxi Dongxing Observation Plate Settlement Plate National Shipping Specifications Full

Guangxi Dongxing Observation Plate Settlement Plate National Shipping Specifications Full

Category:

metallurgy/Steel plate/steel plate

Model:

complete

Brand:

Shun Tian

brand:

Shun Tian

model:

complete

material:

p235

Specifications:

400-500

purpose:

settlement observation

Processing & Customization:

yes

Is it imported:

No

Product Features:

Easy construction

Place of Origin:

Hebei

Retail Price

60.00USD


重量

kg

  • Product Description
  • brand

    Shun Tian

    model

    complete

    material

    p235

    Specifications

    400-500

    purpose

    settlement observation

    Processing & Customization

    yes

    Is it imported

    No

    Product Features

    Easy construction

    Place of Origin

    Hebei

    Description :

      The settlement observation construction of building engineering is mainly aimed at the effective investigation and construction of preventing the consequences of building settlement and deformation. It can prevent or avoid the consequences of structural damage and overall cracking of building engineering caused by settlement deformation through orderly construction and reasonable construction procedures. So, in order to carry out settlement construction more effectively, it is necessary to comprehensively grasp the basic requirements of settlement observation. The so-called hardware requirements refer to the ability to have excellent instruments and equipment during the observation process, which means the need for high-quality settlement observation talents. This is mainly due to the high precision requirements of settlement observation itself, which requires the ability to reflect the settlement situation of buildings during the continuous loading process. So, in order to meet the requirements of settlement observation

      Observation and timing should depend on the foundation and loading conditions. Civil buildings can be observed once every 1-2 floors of height increase; Industrial buildings can be observed separately according to different construction stages, such as backfilling foundation pits, installing columns and roof trusses, masonry walls, and equipment installation. If the building is uniform, it should be measured at least once for every 25% increase in load. If the construction process is temporarily suspended, observation should be conducted once during the suspension and once again during the resumption of work. During the shutdown period, observations can be made every 2-3 months. Observe once every 1-2 months after topping out, and the observation period after completion will be determined based on the condition of the building. Observation should depend on the type of foundation soil and the magnitude of settlement rate. Generally, observations are made 3-4 times a year, 2-3 times in the second year, and once a year after the third year, until then. The observation period is generally stipulated as follows: 2 years for sandy soil foundation, 3 years for soil foundation, 5 years for clay foundation, and 10 years for soft soil foundation. Guangxi Dongxing Observation Plate Settlement Plate National Shipping Specifications Full

    AfterSalesService :

    Key words:
    • Guangxi Dongxing Observation Board