Can the size of the settlement monitoring pile for Guiping settlement plate be customized according to customer requirements for the production and use of settlement plates?
Can the size of the settlement monitoring pile for Guiping settlement plate be customized according to customer requirements for the production and use of settlement plates?

Can the size of the settlement monitoring pile for Guiping settlement plate be customized according to customer requirements for the production and use of settlement plates?

Category:

metallurgy/Steel plate/steel plate

Model:

complete

Brand:

Shun Tian

brand:

Shun Tian

model:

complete

material:

p235

Specifications:

400-500

purpose:

settlement observation

Processing & Customization:

yes

Is it imported:

No

Product Features:

Easy construction

Place of Origin:

Hebei

Retail Price

60.00USD


重量

kg

  • Product Description
  • brand

    Shun Tian

    model

    complete

    material

    p235

    Specifications

    400-500

    purpose

    settlement observation

    Processing & Customization

    yes

    Is it imported

    No

    Product Features

    Easy construction

    Place of Origin

    Hebei

    Description :

      The size of the settlement monitoring pile for Guiping settlement plate can be customized according to customer requirements for the production and use of settlement plates

      Last year, the price of rebar slowly rose in the first half of the year, from around 4000 yuan/ton at the beginning of the year to 6100 yuan/ton, an increase of 50%; The trend in the second half of the year is relatively stable, oscillating within the range of 4800-5800 yuan/ton as a whole. As the main raw material, iron ore experienced ups and downs last year, but in the first half of the year, it surged and broke through historical highs; In the second half of the year, with a significant decline in demand, iron ore fell nearly 50% from its high point, reaching a two-year low. Looking ahead to 2022, overall, it is highly likely that the production restriction policy will continue, the downward trend in demand will slow down, and the weak supply-demand pattern will be difficult to change. In terms of iron ore, the fundamental supply is either too high or continues, and the price moving average is gradually moving downwards.

      During the 14th Five Year Plan period, the Ministry of Industry and Information Technology pointed out the strict implementation of steel production capacity replacement, project filing, and the prohibition of new construction and expansion of smelting capacity. It is expected that China will invest 61.96 million tons of steelmaking capacity and withdraw 64.5 million tons of steelmaking capacity in 2022, and the industry concentration will steadily increase. Peak carbon emissions and carbon neutrality "are medium - to long-term goals, and reducing crude steel production is a practical measure for the steel industry during the 14th Five Year Plan period and beyond. This means that production cuts are not limited to this year, and steel prices are expected to rise in the center of gravity as the industry's supply and demand change and moves towards manufacturing.

      The production and use of settlement plates: 1. The settlement plate is composed of steel plates, measuring rods, and protective sleeves. The size of the base plate is 400cm × 400cm × 10cm, and the measuring rod is made of Φ 40mm steel pipe, fixed in a vertical position with the base plate. The protective sleeve is made of plastic sleeve, and the sleeve size is suitable to cover the measuring rod and allow the ruler to enter the measuring head. As the filling height increases, the measuring rod and sleeve are also correspondingly raised, with each section not exceeding 55cm in length. After raising, the top surface of the measuring rod should be slightly higher than the upper opening of the sleeve. When not measuring, seal the upper opening of the casing with a cap to prevent the filler from falling into the pipe and affecting the free sinking of the measuring rod. Before installation, the roadbed surface must be compacted, and the installation position must be measured. Once the position is fixed, the bottom elevation of the slab should be measured immediately, and this value should be recorded as the initial value. After filling the height beyond 20cm of the observation rod mouth, compact the entire section, and then extend the measuring rod and protective sleeve of the settlement plate. The extension method can be threaded connection or welding connection (measuring rod welding, protective sleeve connection with adhesive tape). After connection, immediately measure the elevation and calculate the actual connection length.

    AfterSalesService :

    Key words:
    • Guiping settlement board