Principles for Setting up Observation Points for Baotou Roadbed Settlement Plate Settlement Plate
Category:
metallurgy/Steel plate/steel plate
Model:
complete
Brand:
Shun Tian
brand:
Shun Tian
model:
complete
material:
p235
Specifications:
400-500
purpose:
settlement observation
Processing & Customization:
yes
Is it imported:
No
Product Features:
Easy construction
Place of Origin:
Hebei
Retail Price
60.00USD
重量
kg
- Product Description
-
brand Shun Tian
model complete
material p235
Specifications 400-500
purpose settlement observation
Processing & Customization yes
Is it imported No
Product Features Easy construction
Place of Origin Hebei
Description :
As a bronze medalist in Pyeongchang and having achieved top two results in multiple world events on the men's speed skating 500m track, Gao Tingyu possesses the ability to compete for gold. In the competition, he appeared in Group 7, where his opponent was Polish player Damian Jurek. After the sound, Gao Tingyu had an excellent start and performed perfectly on the way, breaking the Olympic record with a collision time of 34.32 seconds and winning the fourth gold medal for the Chinese delegation. Another Chinese athlete, Yang Tao, appeared in Group 8 with a time of 35.162 seconds, ranking 21st among the 30 contestants.
Principles for Setting up Observation Points for Settlement Plates
(1) In order to facilitate the monitoring of observation points, centralized observation, unified observation frequency, and comprehensive analysis of data from various observation projects, observation points in different parts must be located on the same cross-section.
(2) The observation points of the roadbed section include settlement observation piles, settlement plates, single point settlement meters, and displacement observation edge piles. Three settlement observation piles are set up for each section of both embankment and road cut sections, arranged at the center of the double track roadbed and 3.2m outside the center of the left and right lines. For sections where the transverse slope of the embankment base is gentler than 1:5, a settlement plate should be installed at the center of the double track roadbed; But when the ground cross slope is greater than 1:5, a settlement plate should be added 3.1m outside the centerline of the left (or right) line on the higher side of the filling. Settlement plate





A single point settlement meter shall be installed at the center of the double track roadbed for embankment sections with a transverse slope of less than 1:5 or road cut sections with foundation reinforcement, red clay, and expansive soil; But for embankment sections with a ground cross slope greater than 1:5, in addition to placing one at the center of the double track roadbed, a single point settlement meter should also be added at a distance of 3.1m from the left (or right) line on the higher side of the fill. For embankment sections, displacement observation stakes are set up at 2 meters outside the slope angles on both sides of the section, and are located on the same section as settlement observation stakes and settlement plates.
(3) In the preloading section of the roadbed settlement plate, during the preloading period, as the surface layer of the roadbed has not yet been constructed, settlement elements should be arranged at the bottom of the preloaded soil (the top surface of the bottom layer of the roadbed) for settlement observation of the roadbed top surface, that is, settlement plates should be temporarily arranged at the top surface of the bottom layer of the roadbed. The displacement observation and base settlement observation arrangements are exactly the same as those of the unpressed section. When the preloaded soil is removed, the temporary settlement plate is removed accordingly. After the construction of the surface layer of the roadbed, formal settlement observation piles are set up on the roadbed surface.
(4) Layered settlement monitoring of deep foundation: Set up bridge and road transition sections in deep Quaternary soil layers, soft soil areas, and near different geological structures. Using a mobile drilling (Φ 108mm) to embed PVC pipes (Φ 49mm) and settlement magnetic rings, and observing with an electromagnetic deep settlement instrument. Layered setting, when the thickness is greater than 3m, a set is added every 3m, and magnetic rings are set at the geological interface and reinforced bottom. The specific layout section and layout position shall be executed according to the requirements of the design documents.
(5) When setting up profile settlement pipes and settlement magnetic rings for full section settlement observation of the embankment base, strict adherence to the design requirements shall be carried out.
AfterSalesService :
Key words:- Baotou roadbed settlement plate
More Products