The recent price of Qitaihe settlement board is 500 yuan. Pre embedded settlement board is in stock
The recent price of Qitaihe settlement board is 500 yuan. Pre embedded settlement board is in stock

The recent price of Qitaihe settlement board is 500 yuan. Pre embedded settlement board is in stock

Category:

metallurgy/Steel plate/steel plate

Model:

complete

Brand:

Shun Tian

brand:

Shun Tian

model:

complete

material:

p235

Specifications:

400-500

purpose:

settlement observation

Processing & Customization:

yes

Is it imported:

No

Product Features:

Easy construction

Place of Origin:

Hebei

Retail Price

60.00USD


重量

kg

  • Product Description
  • brand

    Shun Tian

    model

    complete

    material

    p235

    Specifications

    400-500

    purpose

    settlement observation

    Processing & Customization

    yes

    Is it imported

    No

    Product Features

    Easy construction

    Place of Origin

    Hebei

    Description :

      The recent price of Qitaihe settlement board is 500 yuan. Pre embedded settlement board is in stock

      Promote the clean and low-carbon transformation of energy. On the premise of ensuring energy security, accelerate the pace of coal reduction, implement renewable energy substitution actions, and carry out coal to gas, coal to electricity, and coal to biomass conversion according to local conditions. In principle, no new self owned coal-fired power units will be built, and self owned power plants will be supported to be converted into public power plants. Vigorously developing renewable energy, accelerating the construction of projects such as the "Three Gorges of Land Wind and Power", the "Two Horizontal, Three Vertical, and One Center" oil and gas pipeline network, the "Jidian South Transmission" ultra-high voltage channel, and pumped storage power stations, strengthening the development and utilization of geothermal resources, and creating clean energy production bases and green energy demonstration zones. Adhere to the synchronization of "increasing gas and reducing coal", prioritize the addition of natural gas to meet residents' living and clean heating needs. Increase the proportion of electricity in terminal energy consumption. Continuously promote clean heating. By 2025, the proportion of non fossil energy in total energy consumption will meet the national requirements.

      By observing, organizing, and drawing the process line of foundation settlement time load, the filling rate of the roadbed can be effectively controlled to ensure its stability and safety, and to prevent roadbed instability. This work will be implemented throughout the entire contract section by qualified units of the project department. The frequency of roadbed settlement observation shall not be lower than the provisions in the table below. When environmental conditions change (such as continuous rainfall or continuous drought) or data anomalies occur, timely observation should be carried out. Before installation, the roadbed surface must be compacted, and the installation position must be measured. Once the position is fixed, the bottom elevation of the slab should be measured immediately, and this value should be recorded as the initial value. After filling the height beyond 20cm of the observation rod mouth, compact the entire section, and then extend the measuring rod and protective sleeve of the settlement plate. The extension method can be threaded connection or welding connection (measuring rod welding, protective sleeve connection with adhesive tape). After connection, immediately measure the elevation and calculate the actual connection length.

    AfterSalesService :

    Key words:
    • Qitai River settlement plate