The production of settlement observation points for Ya'an stainless steel observation markers is in progress
Category:
metallurgy/Stainless steel material/Stainless steel bars
Model:
Brand:
Cangzhou Shuntian
grade:
Observation standard
cross-sectional shape:
round bar
surface treatment:
glossy surface
Processing Technology:
Forging
tensile strength:
370MPa~480MPa
Processing Service:
deep processing
execution standard:
National Standard
quality grade:
A-level
Processing & Customization:
yes
Is it imported:
No
weight:
one
Scope of application:
rail transit
delivery service:
Can be delivered to the factory
Type of goods sales:
spot
Item Number:
twenty thousand one hundred and twenty
warehouse address:
Cangzhou, Hebei
warehouse phone:
fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven
manufacturer:
Cangzhou Shuntian Steel Pipe Co., Ltd
Retail Price
13.00USD
重量
kg
- Product Description
-
grade Observation standard
cross-sectional shape round bar
surface treatment glossy surface
Processing Technology Forging
tensile strength 370MPa~480MPa
Processing Service deep processing
execution standard National Standard
quality grade A-level
Processing & Customization yes
Is it imported No
weight one
Scope of application rail transit
delivery service Can be delivered to the factory
Type of goods sales spot
Item Number twenty thousand one hundred and twenty
warehouse address Cangzhou, Hebei
warehouse phone fifteen billion one hundred and three million three hundred and seventy-two thousand six hundred and sixty-seven
manufacturer Cangzhou Shuntian Steel Pipe Co., Ltd
Description :
The working base point (hereinafter referred to as the base point) in the production of Ya'an stainless steel observation standard settlement observation points is the reference point for settlement observation, which should be established according to the requirements of the settlement measurement plan and network layout principles of the project. The settlement measurement plan should be formulated based on the layout characteristics of the project and the environmental conditions on site. Based on work experience, it is generally recommended to set up three base points around high-rise buildings, with a distance of 50m to 100m from the building. The base point can utilize existing and stable buried stone points and wall base leveling points, or set wall base leveling points on buildings with stable foundations and long construction time in the area. If the above conditions are not met in the area, the base point can be buried in a place with good concealment, good visibility, and safety according to the corresponding requirements. The base points set up are strictly prohibited from use until their stability is determined. Therefore, the height difference between the base points should be measured every time to determine whether they are relatively stable, and the base points should be regularly measured in conjunction with high-level benchmarks far away from the building to verify their own stability.
Settlement observation points should be set up in locations that can sensitively reflect changes in building settlement, taking into account factors such as the shape, structure, geological conditions, and pile shape of the building. It is generally installed at the corners of buildings, in locations with significant differential settlement, in sections with significantly different geological conditions, and on both sides of settlement cracks. When burying, pay attention to the reliable connection between the observation point and the building, so that the changes in the observation point can truly reflect the changes in the building. And based on the floor plan design drawings of the building, draw a settlement observation point layout diagram to determine the location of the settlement observation points. A fixed observation route should be established between the working point and the settlement observation point, and marked stakes should be set up at the instrument station and transfer point to ensure that each observation follows the route. Observation marker, observation pile, settlement monitoring pile






AfterSalesService :
Key words:- Ya'an Stainless Steel Observation Standard
More Products