Excavation guardrail
Category:
building materials/Building decoration construction/Building guardrails
Model:
01
Brand:
Suicheng Metal
Material:
ironwork
Height:
1.2 meters
length:
2 meters
color:
Red, yellow, blue, white
Applicable Scenarios:
Construction site foundation pit/edge protection/road isolation
Characteristics:
Durable and sturdy/sufficient stock available
service:
Support customized styles and sizes
Retail Price
10,000,000.00USD
重量
kg
- Product Description
-
Material ironwork
Height 1.2 meters
length 2 meters
color Red, yellow, blue, white
Applicable Scenarios Construction site foundation pit/edge protection/road isolation
Characteristics Durable and sturdy/sufficient stock available
service Support customized styles and sizes
Description :
Foundation pit guardrail is a safety protection facility used on construction sites for deep foundation pit edges, floor edges, and road isolation areas. It mainly solves the safety hazards caused by personnel falling, objects falling, and unclear area division. This type of product is usually welded from wrought iron material, with a stable structure that can effectively prevent personnel from entering dangerous areas by mistake. In construction sites, foundation pit guardrails not only serve as physical isolation, but also warn passing personnel and vehicles through eye-catching colors. They are essential materials that comply with safety production regulations and are widely used in various civil engineering, municipal construction, and temporary construction enclosure scenarios.
The standard size of this foundation pit guardrail is 1.2 meters high and 2 meters long. It is made of iron material and has undergone rust prevention treatment on the surface, providing good weather resistance and durability. In terms of color, standard orange or yellow black warning colors are used, which have strong visual impact and comply with national safety warning color specifications. In terms of product technology, square tube frames are usually welded with grids or steel plates to ensure that the overall structure is sturdy, durable, and has strong impact resistance. Although the specific wall thickness needs to be determined according to customization requirements, conventional products can meet the stress requirements of general construction site edge protection. Some high standard projects can support customized thicker pipes to adapt to more stringent construction environments.
When selecting, the purchaser needs to determine the quantity based on the actual length and height requirements of the protective area. The standard 1.2x2 meter specification is suitable for most conventional excavation and edge scenes. If there are special size requirements on site, such as non-standard width or higher protection level, suppliers that support customized styles can be selected. Compared with ordinary simple fences, wrought iron foundation pit guardrails have more advantages in stability and reusability, and are suitable for long-term or multi project turnover use. Attention should be paid to distinguishing between ordinary isolation nets and specialized foundation pit guardrails. The latter usually has kick plates or reinforcement bars at the bottom, which can more effectively prevent small objects from falling and injuring people. When selecting, it should be clearly stated whether such accessories are included.
When installing foundation pit guardrails, it is necessary to ensure that the columns are firmly fixed. Expansion screws can be used to fix them to the ground or connected through embedded parts to ensure that the guardrails do not tilt when impacted by external forces. In daily use, it is necessary to regularly check whether there are cracks in the solder joints and whether the paint surface has peeled off or rusted. Especially in rainy or humid environments, timely paint repair and maintenance should be carried out to extend the service life. If structural deformation or severe corrosion is found, it should be replaced immediately to avoid protection failure. During transportation and stacking, attention should be paid to handling with care to avoid deformation caused by violent collisions. When idle, it should be stored in a dry and ventilated place for continued use in the next construction cycle.
AfterSalesService :
Key words:
More Products